References

Kotter and Logger Oil platform Reassessment
Two (2) oil producing platforms, both
with a separate wellhead platform,
have been re-assessed for life time
extension.

IVB approval obtained in
2010.

A12 Gas Platform Booster Compressor
Re-assessment of the primary structure
for IVB successful approval in 2010.

KCI designed the addition of
- New 7 MW booster compressor
and utility package
- B13 platform tie-in deck
In total 500T was added to the platform

Horizon Platform Retrofit
800 tons of living quarter and utilities
was added to a platform dating from
1989.

The complete design was executed by
KCI and as part of that the structure
was re-assessed for a life time
extension.

Successful approval by IVB
in 2008.

P6A Gas Platform
Life time extension analyses performed
for the tie-in of two new satellites.

Q4C Platform
Complete FEED and Detailed design
and installation engineering and
management of the Q4C platform.

Project included for all disciplines
including Pipeline and Tie-in design.
Weight indication:
• Topside 2000 ton
• LQ Module 500 ton
• Jacket 1100 ton

During design phase the explosion
analysis were conducted
succesfully.

Bohai Bay Phase II Development
SYMS substructure
FPSO mooring jacket design
connecting to a soft yoke mooring
system subject to wave, earthquake
and FPSO mooring loads.
Challenges where;
- Functional analysis (using
SACS software)
- Foundation analysis (SACS)
- Earthquake analysis
(SLE spectral, DLE static pushover)
- Fatigue Analysis
(waves, high & low frequency
mooring)
- Vessel Impact Analysis
(full plastic, using SACS)

 

Sakhalin II FPSO mooring tower
Ice cone design for FPSO mooring
tower subject to waves and ice plate
loading.

Detailed FEM analysis has been
conducted to assess the local stresses.

Total Field Solution with KCI standard
product;

MPP jackup type platform.
• Complete platform design
• Pipeline design incl. tie-in
• Fabrication management
• Installation engineering and
management
Track record
• 3 platform originally installed
• 2 platforms relocated without
visiting port (by KCI)

This is a proven concept.

M7 field development a Total Field
Solution;


We have designed Complete monotower platform design.
Discipline closely involved where process,

piping E&I + controls,
structural, pipelines and procurement.
This innovative tower design enables
the operator to decommission the
platform with a jackup type of methodology.

Latest news

ONE Basic Design of Maasgeul Awarded
Recently KCI was awarded the Basic Design of the Maasgeul gas treatment pla...